{"id":78426,"date":"2024-11-15T17:54:53","date_gmt":"2024-11-15T16:54:53","guid":{"rendered":"https:\/\/lavozdeibiza.com\/sin-categorizar\/2024\/11\/15\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/"},"modified":"2024-11-15T17:54:53","modified_gmt":"2024-11-15T16:54:53","slug":"work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza","status":"publish","type":"post","link":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/","title":{"rendered":"Work progresses on the east desalinated water branch to reinforce supply in Ibiza"},"content":{"rendered":"<p>The mayoress of <a href=\"https:\/\/lavozdeibiza.com\/category\/municipios\/santa-eularia\/?swcfpc=1\"><strong>Santa Eul\u00e0ria<\/strong><\/a><strong>Carmen Ferrer<\/strong>, together with the manager of the <strong>Balearic Water and Environmental Quality Agency (<a href=\"https:\/\/lavozdeibiza.com\/?s=abaqua&amp;lang=es\">Abaqua<\/a>)<\/strong>, <strong>Emeterio Moles<\/strong>, visited this Thursday the renovation works of the east branch of the desalinated water pipeline in Ibiza. This project, key to improving the island&#8217;s water supply, has a budget of <strong>1.34 million euros<\/strong> and a completion period of three months. During the visit, Ferrer highlighted the importance of this intervention to guarantee a stable supply, especially in seasons of high demand. The renovation includes the replacement of <strong>1,400 meters of pipes<\/strong> that connect the <strong>Can Guasch<\/strong> reservoir, in Santa Eul\u00e0ria, with the network that integrates the desalination plants of <strong>Ibiza<\/strong> and <strong>Sant Antoni<\/strong>.<\/p>\n<h2><strong>A more reliable and efficient network<\/strong><\/h2>\n<p>The main objective of the project is to solve the recurring problems of failures that have affected supply in previous years. To this end, the new pipelines are manufactured with materials of greater structural resistance and have an enlarged diameter, which will improve both the transport capacity and the reliability of the network. In addition, provisions have been incorporated for a future expansion of the Santa Eul\u00e0ria desalination plant, thus reinforcing the water infrastructure for the island&#8217;s future needs. <\/p>\n<h1><strong>Strategic planning<\/strong><\/h1>\n<p>One of the conditions established for this work was to have all the necessary material available before starting the works, in order to avoid delays caused by weather conditions or logistical problems. During the duration of the works, the transfer of water from the Santa Eul\u00e0ria desalination plant to the rest of the island will be temporarily interrupted. This period will also be used to carry out preventive maintenance work on the installation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.<\/p>\n","protected":false},"author":1,"featured_media":73223,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[2910,3270,4551],"tags":[5641,2912,5642,4598],"ppma_author":[2663],"class_list":["post-78426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news","category-municipalities","category-santa-eularia-en","tag-abaqua-en","tag-actualidad-3-en","tag-carmen-ferrer-en","tag-santa-eularia-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Work progresses on the east desalinated water branch to reinforce supply in Ibiza - La Voz De Ibiza<\/title>\n<meta name=\"description\" content=\"The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work progresses on the east desalinated water branch to reinforce supply in Ibiza - La Voz De Ibiza\" \/>\n<meta property=\"og:description\" content=\"The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/\" \/>\n<meta property=\"og:site_name\" content=\"La Voz De Ibiza\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-15T16:54:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2024\/11\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marcos Camiolo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@vozdeibiza\" \/>\n<meta name=\"twitter:site\" content=\"@vozdeibiza\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/\"},\"author\":{\"name\":\"Administrador\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#\\\/schema\\\/person\\\/a117247bb9cbe19d974f3e7836c216af\"},\"headline\":\"Work progresses on the east desalinated water branch to reinforce supply in Ibiza\",\"datePublished\":\"2024-11-15T16:54:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/\"},\"wordCount\":292,\"publisher\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/lavozdeibiza.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg\",\"keywords\":[\"abaqua\",\"Actualidad 3\",\"Carmen Ferrer\",\"santa eul\u00e0ria\"],\"articleSection\":[\"CURRENT NEWS\",\"MUNICIPALITIES\",\"Santa Eul\u00e0ria\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"ItemPage\"],\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/\",\"url\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/\",\"name\":\"Work progresses on the east desalinated water branch to reinforce supply in Ibiza - La Voz De Ibiza\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/lavozdeibiza.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg\",\"datePublished\":\"2024-11-15T16:54:53+00:00\",\"description\":\"The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#primaryimage\",\"url\":\"https:\\\/\\\/lavozdeibiza.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg\",\"contentUrl\":\"https:\\\/\\\/lavozdeibiza.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/current-news\\\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work progresses on the east desalinated water branch to reinforce supply in Ibiza\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/\",\"name\":\"La Voz de Ibiza\",\"description\":\"Diario de informaci\u00f3n actualidad y noticias de Ibiza. Todas las noticias de los municipios de Ibiza\",\"publisher\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"NewsMediaOrganization\"],\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#organization\",\"name\":\"La Voz de Ibiza\",\"url\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/lavozdeibiza.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/logo-lvib-grande.jpg\",\"contentUrl\":\"https:\\\/\\\/lavozdeibiza.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/logo-lvib-grande.jpg\",\"width\":1500,\"height\":1000,\"caption\":\"La Voz de Ibiza\"},\"image\":{\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/vozdeibiza\",\"https:\\\/\\\/www.instagram.com\\\/lavozibiza\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#\\\/schema\\\/person\\\/a117247bb9cbe19d974f3e7836c216af\",\"name\":\"Administrador\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/986e5d1feb165770155d072107f42e3b57732948d149f326b8e7f0d7c430afee?s=96&d=mm&r=g5cb9a474e9f1438539234491a8b23201\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/986e5d1feb165770155d072107f42e3b57732948d149f326b8e7f0d7c430afee?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/986e5d1feb165770155d072107f42e3b57732948d149f326b8e7f0d7c430afee?s=96&d=mm&r=g\",\"caption\":\"Administrador\"},\"sameAs\":[\"http:\\\/\\\/lavozdeibiza.cibeles.net\"],\"url\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/author\\\/administrador\\\/\"},{\"@type\":\"SiteNavigationElement\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#site-navigation\",\"cssSelector\":[\".cib-main-menu\"]},{\"@type\":\"WPHeader\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#header\",\"cssSelector\":[\".cib-header\"]},{\"@type\":\"WPFooter\",\"@id\":\"https:\\\/\\\/lavozdeibiza.com\\\/en\\\/#footer\",\"cssSelector\":[\".cib-footer\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work progresses on the east desalinated water branch to reinforce supply in Ibiza - La Voz De Ibiza","description":"The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/","og_locale":"en_US","og_type":"article","og_title":"Work progresses on the east desalinated water branch to reinforce supply in Ibiza - La Voz De Ibiza","og_description":"The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.","og_url":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/","og_site_name":"La Voz De Ibiza","article_published_time":"2024-11-15T16:54:53+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2024\/11\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg","type":"image\/jpeg"}],"author":"Marcos Camiolo","twitter_card":"summary_large_image","twitter_creator":"@vozdeibiza","twitter_site":"@vozdeibiza","twitter_misc":{"Written by":"Administrador","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#article","isPartOf":{"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/"},"author":{"name":"Administrador","@id":"https:\/\/lavozdeibiza.com\/en\/#\/schema\/person\/a117247bb9cbe19d974f3e7836c216af"},"headline":"Work progresses on the east desalinated water branch to reinforce supply in Ibiza","datePublished":"2024-11-15T16:54:53+00:00","mainEntityOfPage":{"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/"},"wordCount":292,"publisher":{"@id":"https:\/\/lavozdeibiza.com\/en\/#organization"},"image":{"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#primaryimage"},"thumbnailUrl":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2024\/11\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg","keywords":["abaqua","Actualidad 3","Carmen Ferrer","santa eul\u00e0ria"],"articleSection":["CURRENT NEWS","MUNICIPALITIES","Santa Eul\u00e0ria"],"inLanguage":"en-US"},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/","url":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/","name":"Work progresses on the east desalinated water branch to reinforce supply in Ibiza - La Voz De Ibiza","isPartOf":{"@id":"https:\/\/lavozdeibiza.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#primaryimage"},"image":{"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#primaryimage"},"thumbnailUrl":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2024\/11\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg","datePublished":"2024-11-15T16:54:53+00:00","description":"The renovation of 1,400 meters of pipeline aims to guarantee a stable supply and solve problems of breakdowns during the high season.","breadcrumb":{"@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#primaryimage","url":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2024\/11\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg","contentUrl":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2024\/11\/La-alcaldesa-de-Santa-Eularia-Carmen-Ferrer-junto-al-gerente-de-la-Agencia-Balear-del-Agua-y-la-Calidad-Ambiental-Abaqua-Emeterio-Mole.jpeg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/lavozdeibiza.com\/en\/current-news\/work-progresses-on-the-east-desalinated-water-branch-to-reinforce-supply-in-ibiza\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/lavozdeibiza.com\/en\/"},{"@type":"ListItem","position":2,"name":"Work progresses on the east desalinated water branch to reinforce supply in Ibiza"}]},{"@type":"WebSite","@id":"https:\/\/lavozdeibiza.com\/en\/#website","url":"https:\/\/lavozdeibiza.com\/en\/","name":"La Voz de Ibiza","description":"Diario de informaci\u00f3n actualidad y noticias de Ibiza. Todas las noticias de los municipios de Ibiza","publisher":{"@id":"https:\/\/lavozdeibiza.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lavozdeibiza.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","NewsMediaOrganization"],"@id":"https:\/\/lavozdeibiza.com\/en\/#organization","name":"La Voz de Ibiza","url":"https:\/\/lavozdeibiza.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/lavozdeibiza.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2023\/10\/logo-lvib-grande.jpg","contentUrl":"https:\/\/lavozdeibiza.com\/wp-content\/uploads\/2023\/10\/logo-lvib-grande.jpg","width":1500,"height":1000,"caption":"La Voz de Ibiza"},"image":{"@id":"https:\/\/lavozdeibiza.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/vozdeibiza","https:\/\/www.instagram.com\/lavozibiza\/"]},{"@type":"Person","@id":"https:\/\/lavozdeibiza.com\/en\/#\/schema\/person\/a117247bb9cbe19d974f3e7836c216af","name":"Administrador","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/986e5d1feb165770155d072107f42e3b57732948d149f326b8e7f0d7c430afee?s=96&d=mm&r=g5cb9a474e9f1438539234491a8b23201","url":"https:\/\/secure.gravatar.com\/avatar\/986e5d1feb165770155d072107f42e3b57732948d149f326b8e7f0d7c430afee?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/986e5d1feb165770155d072107f42e3b57732948d149f326b8e7f0d7c430afee?s=96&d=mm&r=g","caption":"Administrador"},"sameAs":["http:\/\/lavozdeibiza.cibeles.net"],"url":"https:\/\/lavozdeibiza.com\/en\/author\/administrador\/"},{"@type":"SiteNavigationElement","@id":"https:\/\/lavozdeibiza.com\/en\/#site-navigation","cssSelector":[".cib-main-menu"]},{"@type":"WPHeader","@id":"https:\/\/lavozdeibiza.com\/en\/#header","cssSelector":[".cib-header"]},{"@type":"WPFooter","@id":"https:\/\/lavozdeibiza.com\/en\/#footer","cssSelector":[".cib-footer"]}]}},"authors":[{"term_id":2663,"user_id":13,"is_guest":0,"slug":null,"display_name":"Marcos Camiolo","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/d719857709514c15fae505d026264415c16b7f4ecc142e2402c360de6499f6bb?s=96&d=mm&r=g","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":"","9":"","10":""}],"_links":{"self":[{"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/posts\/78426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/comments?post=78426"}],"version-history":[{"count":0,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/posts\/78426\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/media\/73223"}],"wp:attachment":[{"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/media?parent=78426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/categories?post=78426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/tags?post=78426"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/lavozdeibiza.com\/en\/wp-json\/wp\/v2\/ppma_author?post=78426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}